8.2 C
New York
Thursday, June 25, 2026
HomeWorldIndiaWatch: Amazing drone footage of Noida Super Tech Twin Towers demolished

Watch: Amazing drone footage of Noida Super Tech Twin Towers demolished

finish nine-yearLong legal battleSupertech Twin Towers in Noida crashed in Uttar Pradesh down within a period of Almost nine seconds after use of Explosives on Sunday. The towers, Apex (32 floors) and Ceyane (29 floors), are taller than the Qutub Minar in The national It was 100 meters long and was brought down with explosives weighing at least 3700 kg, in The largest demolition of a tower ever planned.

In the largest demolition ever seen in country, floors of The twin towers collapsed on each other in Stack as seen by thousands of preference points outside exclusion zone in Noida Sector 93A on outskirts of the city of New Delhi.

As the buildings gone downDrone shot, shared by journalist Nikhil Chaudhry on Twitter, take over the cloud of soil rising too blackout final moments of Structures that have been ordered by the Supreme Court a year back to be demolished.

As the dust receded after a few minutes, officials said there were no immediate reports of Any damage to the neighboring apartment complexes in which the Twin Towers sit. It was the nearest apartment complex just Nine meters away.

Read also | R500 crore gold with Wind with destroy of Supertech Twin Towers in Noida

a team From Edifice and Jet Demolitions in South Africa – the two companies that have taken on out Challenging task – Central Building Research Institute (CBRI) and Noida authority have initiated a structural audit of neighboring buildings.

Water sprinklers and anti-smog guns have been activated on site soon After the demolition of help contain dust, and official He said.

More than 5,000 residents have been evacuated

more than 5000 people From the neighboring Emerald Court and its ATS Village communities left they are home hours Before carrying out the demolition out Around 2.30 pm. nearly 3000 vehicles And the over 150 pets were also taken out of Harm way for The next many of hours.

waterfall explosion technique

Officials said the demolition carried out by the “internal collapse of the waterfall” technique she has left An estimated 35,000 cubic meters or 55,000 tons to 80,000 tons of Debris, including concrete, steel and iron railings that can take up to three months to get rid of of.

It was the Supreme Court on The demolition was ordered by August 31, 2021, upholding a ruling by the Allahabad High Court. She said Supertech Co., Ltd. violated building Standards referred to as “collusion” with Noida District Officials in Emerald Court project.

the border wall of The nearby community has been affected

Limit wall of A nearby community was damaged while window glass was damaged of Several apartments developed Cracks, officials said here on Sunday.

gas body of Officials said the Pipeline India Limited (GAIL) that runs through the now demolished structures is safe.

(with input from agencies)


Follow World Weekly News on

Sallie Anderson
Sallie Anderson
Sallie works as the Writer at World Weekly News. She likes to write about the latest trends going on in our world and share it with our readers.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Must Read